Home - Solutions-Project-The installation and commissioning of four fixed loading ramps customized in Jining have been completed
The installation and commissioning of four fixed loading ramps customized in Jining have been completed

In May 2025, a large logistics park in Jining, due to the demand for upgrading of warehousing operations, customized four fixed boarding bridges to our company, which are used to improve the efficiency of loading and unloading of goods and to ensure the high efficiency and safety of daily logistics flow.

Customer demand

The customer wants to realize the fast docking with all kinds of trucks, shorten the loading and unloading time, and reduce the risk of manual operation through the boarding bridge. The equipment needs to meet the following requirements:

● Robust and durable, suitable for high-frequency loading and unloading operations;

● Easy to operate, compatible with different heights of trucks;

● High safety performance, with anti-skid and overload protection;

● on-site environmental adaptation, tailor-made size and installation.

Conclusion

The successful completion of the Jining Docking Bridge project fully reflects our professional strength in non-standard customization and on-site construction. In the future, we will continue to provide more efficient and safer logistics loading and unloading solutions oriented to customer needs.

Solution

After the field survey, our technical team customized four fixed boarding bridges for the customer, with the specification size and load capacity fully adapted to the site use scenario. Each boarding bridge is equipped with hydraulic system, limit device and anti-slip panel to ensure the stability of operation and ease of operation.


Installation and commissioning process:

The project was officially launched in mid-May, and the installation team completed the following work in three days:

● Welding and fixing of the foundation pre-embedded steel plate and anchors;

● Overall lifting and positioning of the boarding bridge;

● hydraulic system access and functional debugging;

● operator use training and maintenance instructions explained.

After the installation of all the equipment is completed, after many rounds of testing and operation, the state is stable and the performance is superior, successfully passed the customer acceptance.