Project
Home - Solutions-Project-Tianjin planned staircase freight elevator installed
Tianjin planned staircase freight elevator installed

This project is a customized rail freight elevator installed for a logistics company in Tianjin, which is mainly used for vertical transportation of goods between high-rise warehouses and distribution centers. Since the company's warehouse space is relatively tight and requires an efficient and space-saving cargo transportation system, we provided a customized rail freight elevator solution.

Project Need

Improve the transportation efficiency of goods up and down the floor, reduce manual handling time.

The freight elevator needs to occupy the smallest space to ensure the maximum use of space in the warehouse.

Provide high load capacity and stability, able to adapt to a variety of cargo transportation needs.

Ensure operational safety, especially in the case of high-frequency use can still ensure efficient and stable operation.

Program design and implementation

According to the customer's needs, we provide tailor-made guideway freight elevator solutions with the following main features:

Space optimization

With compact guide rail design, the freight elevator achieves large loading capacity without occupying too much warehouse space.

High loading design

The loading capacity of the freight elevator can reach 3 tons, which is suitable for transporting large and heavy items.

Intelligent control system

The freight elevator is equipped with an intelligent control system, which can be operated by touch screen, wireless remote control and other ways to improve the operation convenience.

Safety guarantee

Equipped with emergency brake, overload protection, door lock protection and other safety designs to ensure the safety of goods transportation process.

Installation Process

After the customer's confirmation of demand, our team quickly carried out the production and design of the freight elevator, and carried out a detailed installation program planning according to the actual situation on site.


Construction team accurately measured and installed the guide rail system on site to ensure the flatness and stability of the guide rail.


The installation and debugging of the power distribution system and control system were also tested several times to ensure error-free operation and the ability to cope with high load operation.


Finally, we carried out strict safety checks and operation tests to ensure that the freight elevator reaches the best operating condition before it is put into use!

Do you have any questions?
Listen to SREPOWER
Contact Us